Charge your electric trucks, buses, vans, and fleets quickly on your own property. From 60 kW to megawatt charging (MCS), tailored to what your grid connection allows.
From two charging points to a megawatt charging plaza, using open standards: CCS2, MCS, and OCPP.
A high-performance charging station with dual CCS2 connectors and smart load balancing.
A powerful charging station that supports up to four charging points
A scalable charging station with a capacity of up to 3,500 kW, supporting both CCS2 and MCS megawatt charging.
Easy to move for temporary loading areas, construction sites, or remote locations.
Battery storage and DC fast charging in a single 10-foot mobile container. Quick to move and deploy.
A single e-truck connected to a fast charger draws more power than a manufacturing plant during peak hours. Smart load balancing keeps the charging within your connection’s capacity; a battery absorbs the rest.
Complete data sheets, applications by sector, and how the chargers work with the battery and BoltOS.
Get the brochure
Download the brochure
Straight to your inbox. No newsletter, unless you want one.
What SPRILA covers, which chargers and batteries are eligible, and how to ensure your application is approved.
Get the grant guide
Download the brochure
Straight to your inbox. No newsletter, unless you want one.
E-trucks charge at their own depot, during loading and unloading, or overnight. Without having to wait for grid upgrades.
Public and semi-public high-throughput fast-charging stations, with payment and management via OCPP.
Quickly charge your own fleet of vehicles, visitors' vehicles, and employees' vehicles using an existing connection.
Charging infrastructure for tenants and visitors without placing additional strain on the building's electrical connection.
Charging electrical equipment and vehicles where there is no outlet yet or where the outlet is too small.
Charger, battery, and software—all from a single source. That way, you know exactly what you're buying and who to call.
We manufacture both, so they work together as a single system.
BoltEMS controls the battery, solar panels, and chargers locally; your data remains yours.
Short lead time, including for charging stations.
OCPP, CCS2, and MCS. No vendor lock-in.
Nationwide network for installation and maintenance.
We often spot problems before you do.
"Our solar panels are really paying off now! With Boltainer batteries and BBT software, we use our own electricity whenever it suits us and save a lot on feed-in tariffs."
"Thanks to Boltainer, we've reduced our energy costs by over 30% and are no longer subject to grid restrictions. Our production is running more efficiently than ever!"
"We need far fewer diesel generators on the construction site. Combined with battery storage, we now always have a reliable and sustainable power supply, no matter where we're working."
Can't find your question here? Please contact us.
Not always. The chargers dynamically distribute the available power among the charging points while staying within your contracted capacity. If that’s not enough, a BOLT battery absorbs the peaks. This way, you avoid having to wait years for grid upgrades in the event of grid congestion.
Two vehicles at a time: BOLT-DC180. Three to four vehicles or heavy-duty transport: BOLT-DC480. Five or more, or megawatt charging for e-trucks: BOLT-DC1000 MCS. Use the selection guide at the top of the page or request a simulation report.
That depends on the load capacity, the number of charging points, your grid connection, and whether a battery is required. In the simulation report, we compare the investment, the SPRILA subsidy, and the payback period with the annual costs: energy, contracted capacity, maintenance, and monitoring. This allows you to compare one-time and recurring costs in a single overview.
Yes. The BOLT-DC480 can charge up to four vehicles, while the BOLT-DC1000 MCS can charge up to twelve. Power is dynamically distributed in 40-kW increments, so that each vehicle receives the amount of power it can handle.
Yes. All chargers support OCPP 1.6J and are OCPP 2.0.1-ready. You can connect them to virtually any charging management platform for access, rates, and billing, including for visitors via roaming. You can start charging using RFID, AutoCharge, or Plug & Charge (ISO 15118).
Up to 40% for private charging infrastructure for heavy-duty vehicles, depending on company size and application. Battery storage that enables charging may be eligible. Download the grant guide or have us include it in your consultation.
Chargers and batteries are in stock in the Netherlands. Installation is performed by a certified installation partner in your region, typically within 6 to 8 weeks after approval. We will coordinate the grid connection with your grid operator.
Yes. The BOLT-DC1000 MCS can be expanded in parallel up to 3,500 kW and twelve charging points. For smaller charging stations, we design the grid connection and cabling so that you can add charging points or a battery later on.
Chargers and batteries are connected via 4G, Wi-Fi, or Ethernet for remote monitoring. We monitor systems 24/7 from Diemen and take proactive action, often before you even notice anything is wrong. Maintenance is handled by our certified partners.
Share your grid connection and vehicle fleet information. Within two business days, we’ll have a free simulation report ready that includes charging capacity, the number of charging points, and whether a battery is needed. We’ll go over it together.
“The first supermarket in the region to offer 400 kW DC fast charging on its own property. ”
Jumbo Mieremet, The Hague