Smart battery with Dutch software
Can be installed in any room
No more negative energy hours
Take control of your energy usage
180–3,500 kW One manufacturer for every power rating
100% Dutch software
Up to 40% SPRILA Grant

DC fast chargers, even with a limited grid connection

Charge your electric trucks, buses, vans, and fleets quickly on your own property. From 60 kW to megawatt charging (MCS), tailored to what your grid connection allows.

  • 180–3,500 kW One manufacturer for every power rating
  • 100% Dutch software
  • Up to 40% SPRILA Grant
crown energy
willy-naessens
ASML.D
Lely
Jumbo_Logo
van-de-voorde
kek
bbolt

Five charging solutions, designed in-house and available from stock

From two charging points to a megawatt charging plaza, using open standards: CCS2, MCS, and OCPP.

How many can be charged at the same time?
Our advice No choice yet Select the vehicles and the quantity, and we'll highlight the appropriate charger.
BOLT-DC180

BOLT-DC180 (180 kW)

A high-performance charging station with dual CCS2 connectors and smart load balancing.

BOLT-DC480

BOLT-DC480 (480 kW)

A powerful charging station that supports up to four charging points

BOLT-DC1000 MCS

BOLT-DC1000 MCS (up to 3,500 kW)

A scalable charging station with a capacity of up to 3,500 kW, supporting both CCS2 and MCS megawatt charging.

Not sure which charger is right for you yet? We’ll calculate it based on your specific connection, or you can take your time to read the brochure first.

Fast charging without overloading the grid

A single e-truck connected to a fast charger draws more power than a manufacturing plant during peak hours. Smart load balancing keeps the charging within your connection’s capacity; a battery absorbs the rest.

  • Dynamic Power Allocation The charger distributes the available power in 40-kW increments among the active charging points and stays within your contracted power limit.
  • Battery as a buffer Charges when there is capacity on the grid and supplies power when multiple vehicles are charging at the same time. This allows you to charge faster than your grid connection permits, without overloading the grid.
  • Prioritize Your Own Solar Power Solar, battery, and chargers as a single system, prioritizing your own generation and charging during the cheapest hours.
  • Management and Billing Who is charging, with which card, and at what rate: via OCPP linked to your charging management platform, or via our dashboard. Includes roaming for visitors.

Want to read it first?

Image to follow: Cover of the DC Charging Stations Brochure
Brochure

All three chargers in one brochure

Complete data sheets, applications by sector, and how the chargers work with the battery and BoltOS.

  • Specifications for the DC180, DC480, and DC1000 MCS
  • Asset Allocation and OCPP Integration

Get the brochure

Download the brochure

Straight to your inbox. No newsletter, unless you want one.

Where Our DC Fast Chargers Are Located

All projects

From Grid Connection to Charging Station in Four Steps

Grid Connection and Fleet
Load capacity and number of points
Software and any batteries
Installation and Monitoring

Charger, battery, and software—all from a single source. That way, you know exactly what you're buying and who to call.

Orlando de Jonge, Boltainer

Why Choose Boltainer's Charging Infrastructure

  • Charger and battery from a single source

    We manufacture both, so they work together as a single system.

  • Dutch-developed software

    BoltEMS controls the battery, solar panels, and chargers locally; your data remains yours.

  • Inventory in the Netherlands

    Short lead time, including for charging stations.

  • Open Standards

    OCPP, CCS2, and MCS. No vendor lock-in.

  • Certified Installation Partners

    Nationwide network for installation and maintenance.

  • 24/7 monitoring

    We often spot problems before you do.

Farmer Dairy farming

"Our solar panels are really paying off now! With Boltainer batteries and BBT software, we use our own electricity whenever it suits us and save a lot on feed-in tariffs."

Facilities Manager Industrial sector

"Thanks to Boltainer, we've reduced our energy costs by over 30% and are no longer subject to grid restrictions. Our production is running more efficiently than ever!"

Fleet & Equipment Manager Construction Company

"We need far fewer diesel generators on the construction site. Combined with battery storage, we now always have a reliable and sustainable power supply, no matter where we're working."

Frequently Asked Questions About DC Charging

Can't find your question here? Please contact us.

Not always. The chargers dynamically distribute the available power among the charging points while staying within your contracted capacity. If that’s not enough, a BOLT battery absorbs the peaks. This way, you avoid having to wait years for grid upgrades in the event of grid congestion.

Want to know what fits your connection?

Share your grid connection and vehicle fleet information. Within two business days, we’ll have a free simulation report ready that includes charging capacity, the number of charging points, and whether a battery is needed. We’ll go over it together.

No obligation · Response within 2 business days

“The first supermarket in the region to offer 400 kW DC fast charging on its own property. ”

Jumbo Mieremet, The Hague