Smart battery with Dutch software
Can be installed in any room
No more negative energy hours
Take control of your energy usage

Project Sipsma Boere General Partnership

Image

Sipsma Boere General Partnership

BOLT-215

Project: 10-
Project scope:Supplyof BOLT-215
Location: Oudewater, Netherlands

Related projects

Jumbo Mieremet launches 400 kW fast charger with battery storage

Jumbo Mieremet in The Hague became the first supermarket in the region to install a 400 kW DC fast-charging station with 430 kWh of battery storage. Thanks to the smart use of storage, two cars can charge simultaneously without placing an additional load on the power grid.

Read the case study
  • Fast charging without overloading the grid
  • Charging two cars at the same time

Solar optimization at an agricultural solar farm in Overijssel

The BOLT-40 increases the value of every kWh generated.

Read the case study
  • Smart deployment through forecasting and market-driven strategies
  • Additional revenue from energy trading