Key fact: The monthly peak that your utility company uses for billing is the highest measured 15-minute value for that month. So, a single 15-minute period determines your costs for thirty days. For most companies, this peak is caused by simultaneous usage that no one intentionally planned, and part of it can be eliminated without any investment.

Where Peaks Come From

A peak is rarely caused by a single machine. It’s almost always the result of multiple processes that happen to be demanding power at the same time.

Cause What's Happening How many times viewed
Simultaneous Startup All lines start when the shift begins Very often
Inrush current Motors, compressors, and pumps draw a multiple of their rated power when starting up Often
Cooling on Hot Days Refrigeration and freezing systems run at full capacity during the hottest hours Often
Charging During Production Loading forklifts and commercial vehicles while production is underway Frequently, and growing rapidly
Batch Processes Ovens, presses, dryers, or cleaning cycles with short, high-demand periods Sector-dependent
Testing and Maintenance Emergency power tests or test runs outside the normal schedule Occasional, but expensive

That last point is worth noting: a single test at the wrong time can lock in your monthly peak for thirty days. Be sure to schedule such actions during a quiet period.

Here's how to identify your own peak

  1. Request the quarterly readings for the past twelve months from your utility company.
  2. Find the highest value for each 15-minute period in a given month and note the date and time.
  3. In addition, outline your production and staffing plans for those periods.
  4. Ask the operators what was playing back then. That often yields more insight than the data itself.
  5. Look for the pattern: Are the hours, days, and combinations always the same?
  6. Divide your peaks into three categories: structural, seasonal, and incidental.

This three-part approach determines how you handle the situation. You address structural peaks through planning or technical solutions, seasonal peaks through capacity, and occasional peaks primarily through agreements.

Measures listed in order of cost

1. Organizing doesn't cost anything

Start up in phases, with a few minutes between each line. Shift charging to nighttime or off-peak hours. Spread energy-intensive batches throughout the day. Schedule tests and trial runs outside your peak window.

Document these agreements in work procedures, not just in an email, because otherwise they’ll get lost during the first busy week. Measure the impact during the monthly peak the following month.

2. Automation, limited investment

An energy management system that briefly reduces the power to non-critical loads when the limit is approaching. Examples include charging stations that temporarily draw less power or a cooling system that waits five minutes. This only works if you determine in advance what is critical and what is not.

3. Buffering: The Investment That Covers the Rest

Anything you can’t manage or adjust without affecting your process can be handled by a battery. That’s the essence of peak shaving: the moment you’re about to exceed your limit, the system steps in to provide additional power, and then it recharges during a quiet period.

The order is intentional: first organize, then automate, and only then invest. Those who reverse this order often end up buying a system that’s a bit too big for their needs.

What lower peak do you produce?

Effect Explanation
Lower monthly peak rate Immediately visible on your utility bill
Possible reduction in contracted capacity Structurally lower fixed costs
Room for expansion New equipment fits into the same connection
Lower risk of exceeding the limit No corrections or additional charges
Provide better justification to your utility provider Measurement data and a plan carry a lot of weight in every discussion

The latter is no small matter in today’s market. Capacity that you consistently fail to use may be reduced by the grid operator under certain conditions. Those who have their profile and plans laid out in writing are in a stronger position in those discussions.

Two numbers you need to know

Before you decide on a course of action, you'll want to have two numbers on the table.

How often do you reach your limit? It’s not about how many kilowatt-hours you use, but rather how many quarter-hours per year you exceed your desired limit. For most companies, that number is surprisingly low—in the range of tens to a few hundred quarter-hours out of the more than 35,000 that make up a year.

How far you go beyond it. The difference between your peak and your limit, in kilowatts. That number determines the required power and, consequently, a large part of the investment.

Together, these two factors indicate whether you have an organizational problem or a capacity problem. Many shallow overruns point to concurrency that you can plan for. Few deep overruns point to a process that simply requires capacity and is best managed with a buffer.

What You Often See by Sector

Production. The morning start-up almost always represents the highest peak. A phased start-up yields the fastest results here, and what remains is often a sharp, short peak that can be easily smoothed out with storage.

Cold storage and freezer facilities. Peak demand is tied to the weather. This requires capacity on the hottest days and a system that can pre-cool when energy is cheap.

Logistics. Loading demand is growing the fastest. Without taking action, loading commercial vehicles will interfere directly with your production peak. By storing goods behind a loading area, you can keep the drawdown from the grid steady.

Metal and plastic. Presses, ovens, and injection molding machines produce short, very high power spikes. An industrial battery with high power output and relatively low capacity is often the best choice for these applications.

Agriculture. Irrigation, ventilation, and milking robots reach peak usage at specific times, often combined with significant on-site power generation. Self-consumption and peak shaving reinforce each other in this context.

Which system size corresponds to which peak?

Exceedance Direction
Tens of kW, in short A 100 kWh battery or compact cabinet
Around 100 kW, at various times A 200 kWh battery
Hundreds of kW, longer periods of exceeding the limit A 1 MWh battery

Always verify this using your own data. Consecutive peaks with little time between them add up, because the battery cannot fully recharge in between.

How to Make the Effect Measurable

A reduction in peak levels that you can't demonstrate will be forgotten as soon as something else comes up. That's why you should document what you're measuring from the very beginning.

  1. Baseline measurement. The highest 15-minute value per month over the past twelve months, along with the corresponding time.
  2. Target value. The limit you want to stay below, and why you chose that limit.
  3. One measure per period. Otherwise, you won't know which intervention caused the effect.
  4. Monthly feedback. Compare the new monthly peak with the baseline measurement and with your target value.
  5. Explain outliers. Every instance where a limit is exceeded has a cause. Make a note of it, because that’s where your next action will come from.

These five steps take half an hour per month and provide the rationale you need to both justify the investment internally and discuss it with your utility provider externally.

Frequently Asked Questions About Peak Load

Is my monthly peak really just 15 minutes?

Most utility companies do this: the peak rate is calculated based on the highest measured 15-minute value for that month. That’s exactly why a single unfortunate moment determines your bill for thirty days, even if the rest of the month was uneventful. Check the exact methodology in your utility company’s rate schedule, as the details may vary.

How much can I accomplish through planning alone?

It varies greatly, but for companies where everything launches simultaneously, the gain is often substantial and costs nothing. You really notice it when you compare it to the monthly peak of the following month. Treat it as an experiment: make one change per month, so you know which measure caused the effect.

What is inrush current, and does it count?

When starting up, motors, compressors, and pumps briefly draw a multiple of their rated power. Whether this affects your 15-minute average depends on how long that peak lasts: half a second is averaged out over 15 minutes, but multiple starts in quick succession are not. This is reflected in the measurement data as an elevated 15-minute average at the moments of startup.

Would a soft starter or variable frequency drive also help?

Yes, they reduce the inrush current of individual motors and are, in many cases, a wise investment, regardless of your peak current issue. However, they don’t solve the problem of simultaneous startup: if five machines start up at the same time, the total current remains high. Therefore, combine them with phased startup.

Do I need to check the voltage first, or can I just put in a battery right away?

Take measurements first. Without quarter-hourly data, you won’t know how much power and capacity you need, and you’ll almost certainly end up buying a system that’s too large or too small. What’s more, you can request this measurement data for free from your utility company, and it will immediately serve as the basis for your investment decision.

Can I smooth out spikes without a battery?

Partly. With proper planning and an energy management system that reduces the power to non-critical loads, you can go a long way. The limit is what you can’t postpone without affecting your process. That part requires storage, or a higher-capacity connection if one is available.

How do I know if my spike is a recurring issue or a one-time occurrence?

By comparing the highest 15-minute values for each month over a 12-month period. If they are close together and occur at similar times, the pattern is structural. If one month stands out, something unusual has happened, and that can often be prevented through agreements. These two types of peaks require different measures.

What are the benefits of reducing my peak by a quarter?

That depends on your rates and how often you reach that peak. The savings come from the monthly peak rate and possibly from a lower contracted capacity, as well as from the room you have left to grow. We run the numbers based on your specific profile in the simulation report, including the scenario where you take no action.