Charging electric trucks on-site
Charging electric trucks requires charging stations with a higher power output than standard charging points for passenger cars. Depending on the type of vehicle and its intended use, different charging capacities can be selected.
At many logistics sites, charging stations are being installed where multiple trucks can charge at the same time. This often takes place at set times, such as at the end of the workday or during scheduled downtime.
In practice, this means that careful consideration must be given to
- The number of vehicles
- The required load capacity
- Available grid capacity
Get a free simulation report