1,000 kWh battery container
While competitors accept wait times of 12 to 18 months for a grid connection, Boltainer customers with 1,000 kWh of storage are up and running at full capacity within weeks. A container of this size is the standard choice for manufacturing facilities, cold storage and freezer facilities, data centers, and charging stations where peak demand far exceeds the available grid capacity.
The container-based solution requires no structural modifications, no months-long permitting process, and no alterations to the meter box. The system is installed on a concrete slab, connected to the existing electrical system, and is operational as soon as commissioning is complete.
Discover the Container